Work on the end tables continue. With the base pieces cut, milled and prepped, and the joinery done (mortise and tenon) it was time to assemble. Glued the pieces together, clamped them up and got them both completed.
Had to take a trip for work this week, so didn’t get a chance to keep working. Next steps is to put in the pieces to support the drawers and bottom shelf, and from there, it will be time to complete the tops. Then it will be on to the drawers.