Ready to start the glue up

So I’ve got the boards milled down to the proper thickness, cut to length and width for the cabinet top, bottom and sides.

Then I cut box joints in 2 of the cabinet sets, and then 45-degree miters for the other 3 (trying two different methods).

Added dado (4 of them) in each side for the drawer rails.

Finally added a rabbet to the back to hold the back panel in place.

Now its on to the most nerve racking part – the glue up. Got to get everything clamped in place and square, in order for this to work.

Leave a Comment

Your email address will not be published. Required fields are marked *